Bluecastle Capital invests in, develops, and operates institutional-scale Build-to-Rent (BTR) properties.

A high-quality amenity offering is central to our vision, which focuses on resident experience and fostering a sustainable, cohesive community. Social and physical wellbeing are central to our developments, which aim to have a wide appeal to a diverse demographic inclusive of all generations.

Bluecastle will:

  • Manage the homes long-term.
  • Remain committed to the ongoing quality and maintenance of the building.
  • Prioritise resident well-being through innovative and environmentally conscious design.
  • Strive to foster positive outcomes for residents, communities, and the environment.

REAP 5, a wholly owned subsidiary of Bluecastle Capital, acquired the site and is the developer. Bluecastle controls the full value chain of the BTR asset life cycle, from initial development through to long-term operational ownership via its institutional BTR fund.

BTR, or Build-to-Rent, is a development purpose built to be occupied by rental tenants. This means the buildings include amenity such as social spaces, reception, and a dedicated management team.

We are proposing 804 new homes through two landmark new tall buildings, providing much needed homes along with amenity space including a café to be used by residents and visitors. The current mix comprises mainly one- and two-bedroom homes, with 60 three-bedroom homes. The proposal gives back 70% of the site as landscaped open space.

We also propose returning this section of the Aire bank to nature and Leeds after being neglected and inaccessible for over a decade.

We are working with Leeds City Council officers, and the exact height of the buildings is yet to be finalised. Our current thinking is Block A at 39 storeys and Block B at 37, subject to ongoing discussion.

The buildings will be landmarks for Leeds, carefully designed to respond to its context within the West End Tall Building Cluster and the history of the site, complementing the emerging skyline.

There have been a number of historic planning permissions on the wider site, which have now expired. We are seeking full planning permission for a new residential Build-to-Rent development on this site, along with landscaping to open up a new riverside walk.

Wellington Road sits along the River Aire, just a 15-minute walk from Leeds train station, at a key western gateway into the city centre. The site has been vacant and inaccessible for over a decade, since the Yorkshire Post left. We see this as the next piece of the puzzle in regenerating this stretch of the riverside, and an opportunity to deliver much-needed homes in a prime city-centre location alongside new public realm and a restored riverside walk.

The proposals include a publicly accessible riverside walk and cycle route, new landscaped green spaces, and a ground-floor café that will be open to residents and visitors alike. We are also providing generous amenity space for residents, which could include social and co-working spaces, a gym, and communal areas. The current proposals include over 4,000 sqm of open space, alongside extensive new planting and public realm.

The clocktower is not within our site boundary or the Applicant’s ownership.

A detailed daylight and sunlight assessment will be submitted as part of our planning application, assessing the impact on neighbouring properties. The buildings have been carefully massed and positioned to minimise any impact on surrounding buildings, and early technical assessments indicate that the scheme performs well.

Wind is an important consideration for all tall buildings, especially in Leeds. The buildings’ footprint and shape have been designed with this in mind from the onset, with early comparative testing identifying the chamfered form as the preferred approach. Further detailed assessment will continue to inform any podium, canopy or landscape mitigation required.

We have also factored the cumulative impact of neighbouring proposals into our studies.

We are at pre-application stage and are currently engaging with Leeds City Council. Subject to receiving planning permission, we expect to start on site in 2028 and complete in 2031.

The development will inject significant investment into Leeds during the construction phase, supporting local jobs and the supply chain. Once complete, the buildings will bring hundreds of new residents to the city centre, contributing to the local economy through everyday spending. Bluecastle’s long-term ownership model means we will remain a committed investor in the city for the long term.

The development will share an access road with the neighbouring site to the north. Access will be taken from Wellington Way, providing access for vehicles, servicing and deliveries. The proposals include two lay-bys for servicing and taxi pick-up/drop-off, with no standard resident car parking.

A Transport Assessment will be submitted with the planning application, setting out how the development will manage vehicle movements, servicing, and pedestrian and cycle access. The scheme is highly sustainable in transport terms given its proximity to Leeds city centre and rail connections, and we are designing the scheme to prioritise walking and cycling.

Most occupants of BTR schemes do not drive, and so the traffic generated from this scheme will largely come from deliveries, servicing, taxis, blue badge parking and car club use.

The site is located within Leeds city centre, within easy walking distance of the train station and with excellent public transport connections. Given this highly sustainable location, and consistent with comparable Build-to-Rent developments in Leeds, the proposals include limited car parking provision, including two blue badge bays. Extensive secure cycle storage will be provided to encourage sustainable travel, including 390 long-stay cycle spaces and an 8-space Beryl Bike docking station.

As a Build-to-Rent development, and in line with comparable developments in Leeds such as the Transformer Building across the road, all homes at Wellington Road will be available to rent rather than for sale. Rental prices have not yet been set, as these will be determined closer to the buildings’ completion. Rents will be competitive and reflective of the high-quality homes and amenity on offer. Bluecastle’s model is designed to attract a wide range of residents who will spend in the City and contribute to its community.

At this stage of the planning process, we are unable to confirm how affordable homes will be provided through the scheme. We are in discussions with Leeds City Council, and will be able to confirm this once the planning application is submitted.

Biodiversity Net Gain (BNG) is a requirement of the planning process, with a government target set at 10%. An ecology team has been instructed to formulate a plan to meet this. The landscape proposals also retain all existing trees on site and include extensive new planting, identifying the potential for up to 138 new trees, approximately 1,800 sqm of planting and opportunities to create new habitat along the riverside.

The landscape strategy seeks to turn a currently inaccessible riverside site into a greener public realm. Current analysis identifies the potential for up to 138 new trees, alongside retention of existing trees on site. The plans have the potential to provide 4,119sqm of landscaping in total, equating to 70% of the site. The detailed planting and ecology strategy will continue to be developed through the planning application.

The site has been derelict following the demolition of the Yorkshire Post building, with satellite imagery showing the land is currently empty. Tree survey work has identified two clusters of Category B trees on site, and the current proposals seek to retain the existing trees while introducing substantial new planting and landscaped habitat.

As an early stage in the planning process, we will submit an EIA (environmental impact assessment) screening request to the Council. The Council will then decide whether this will be necessary.

As a Build-to-Rent development, staff will be required to operate and maintain it. This includes reception staff, cleaners, and maintenance. Furthermore, we anticipate the occupiers will spend in local shops, boosting the economy beyond our site boundary.

We are at too early a stage to say with certainty and detail, but a building of this size will generate a significant number of jobs and has the potential to invest into local supply chains.

Bluecastle has received planning permission to build a similar BTR development in Cardiff, we also have proposals for Birmingham, Stevenage, and Sheffield. More information on these projects can be found on our website.