The site
Wellington Road sits on the banks of the River Aire, just a 15-minute walk from Leeds railway station. The site was previously home to the Yorkshire Post building, which has stood empty since the newspaper relocated to new premises over a decade ago. Our Site is known as ‘Plot C’ on the wider Former Yorkshire Post Site.
Since then, this stretch of riverside has been neglected and inaccessible to the public. We believe this is the next piece of the puzzle in regenerating this stretch of the Aire riverside, with the rest of the former Yorkshire Post Site already being developed.
The Site previously had planning permission for a residential scheme, but this was never built. Our proposals bring forward an improved and updated design for the site, reflecting the latest thinking on design, sustainability and placemaking. As a developer and long-term operator, we are committed to bringing this site forward and bring certainty to this last undeveloped local area.
We are seeking full planning permission for a new Build-to-Rent (BTR) residential development, together with new landscaping that will open up a public riverside walk for the first time in over ten years.


-
804
new homes
-
2
landmark buildings
-
70%
of the site provided as new public open space
-
Up to 138
new trees, with all existing trees retained
What we’re proposing
New homes for rent, including a range of apartment sizes to suit different households, 1-, 2- and 3-bed
Two landmark buildings of exceptional design quality, with state-of-the-art facilities for future residents
Connections to the River Aire, including a riverside walk and other green spaces for local residents, workers and passers-by
Retention of all existing trees and planting up to 138 new trees, with 70% of the site provided as new public open space
Space for a new riverside café and children’s play space to create a new local destination for all of Leeds to enjoy

Landmark buildings
Wellington Road sits within the West End Tall Building Cluster. Our proposals are carefully designed to respond to this context and the history of the site, complementing the emerging Leeds skyline. This includes instructing award-winning architects, Squire & Partners, to ensure the design is of exceptional quality, ensuring residents benefit from light, spacious apartments with well-equipped, state-of-the-art amenities for modern living.
The façades have been designed to be unique and striking to bring interest to the buildings.
We are working closely with Leeds City Council on the design as it develops, including the exact height and massing of the buildings. Every aspect of the design, from daylight and sunlight to wind, is being carefully assessed to make sure the buildings are able to contribute positively to the area.
-
39 & 37
storeys, our current thinking, subject to ongoing discussion

A long-term commitment to Leeds
Unlike many housing developments, our buildings will be owned and managed by Bluecastle Capital for the long term. This means a dedicated on-site team, a genuine commitment to the ongoing quality and maintenance of the buildings, and a lasting stake in the success of the new community, not just during construction but for years to come.
Our aim is to create a place that appeals to a wide range of people, and to build a sustainable, cohesive community around it.
Taking sustainability to new heights
We are taking a long-term, ambitious approach to sustainability:
BREEAM ‘Excellent’
The scheme is targeting BREEAM ‘Excellent’ and Home Quality Mark Level 4, alongside anticipated compliance with the 2025 Future Homes Standard, future-proofing the buildings to meet the demands of generations to come.
80%
A proposed 5th generation heat network, developed with Imperial College London’s Department of Earth Science and Engineering, combines ground and air source heat pumps to deliver an estimated 80% saving in net annual energy use. This design minimises overheating and will set a new benchmark for building sustainability in Leeds.
We commit to continually monitoring the energy performance and sustainability of the buildings once completed, to ensure the highest standards of sustainable operation are maintained.
390
Extensive secure cycle storage will be provided to encourage sustainable travel, reflecting the site’s excellent city-centre location and transport links
Supporting the local economy
Our proposals will bring investment and activity to this part of the city, both during construction and once complete:
Construction will support jobs and the wider supply chain
Once occupied, the buildings will bring new residents into the city centre who will spend in local shops and businesses
The new café and riverside walk will help create a destination for the wider neighbourhood, not just future residents